GRASP Algorithm to Minimize Makespan in a No-Wait Flow Shop with Batch Processing Machines
Fecha
2012-05-19
Autores
Muthuswamy
Shanthi
Mario C. Vélez-Gallego
Maya
Jairo
Rojas
Miguel
Título de la revista
ISSN de la revista
Título del volumen
Editor
Inst of Industrial Engineers; Cdr edition
Resumen
Given a set of jobs and two Batch Processing Machines (BPMs) in a flow shop environment
the objective is to batch the jobs and sequence the batches such that makespan is minimized.
the objective is to batch the jobs and sequence the batches such that makespan is minimized.