Logotipo del repositorio
  • English
  • Español
  • Français
  • Português
  • Iniciar sesión
    ¿Has olvidado tu contraseña?
Logotipo del repositorio
  • Comunidades
  • Listar por
  • English
  • Español
  • Français
  • Português
  • Iniciar sesión
    ¿Has olvidado tu contraseña?
  1. Inicio
  2. Examinar por materia

Examinando por Materia "Modelo de Black-Sholes"

Mostrando 1 - 3 de 3
Resultados por página
Opciones de ordenación
  • No hay miniatura disponible
    Ítem
    Modelos de tiempo continuo para finanzas corporativas
    (Universidad EAFIT, 2010) Cano Giraldo, Andrés Felipe; Cárcamo Cárcamo, Ulises
    This Project is an approach to the study of continuous time models (models based on stochastic calculus and stochastic differential equations)for corporate finance -- In addition to the presentation of two basic models and a theoretical framework for other models, it shows the point of view of some researchers regarding the structural models -- In the first part, requisites for those models, related to stochastic calculus and stochastic differential equations, are presented -- Later some methods for estimating their necessary parameters
  • No hay miniatura disponible
    Ítem
    Opciones reales y simulación en la evaluación financiera de proyectos de construcción de vivienda
    (Universidad EAFIT, 2010) Suárez Orozco, José Humberto; Ruíz Anzola, Eduardo
  • No hay miniatura disponible
    Ítem
    Valoración por opciones reales como alternativa para valorar proyectos de infraestructura flexibles
    (Universidad EAFIT, 2017) Samacá Aguirre, Sergio Alexander; Sánchez Ribero, Gustavo Alberto
    This work aims to apply the methodology of valuation of mega infrastructure projects through real options, as a very important analysis proposal in the decision making of investment, taking into account the multiple infrastructure projects (energy, roads, aqueducts, Among others) that are being advanced and projected in Colombia and Latin America -- In practice, infrastructure projects are evaluated through traditional valuation methodologies such as Net Present Value, IRR, IRR, RBC; However, infrastructure projects may incorporate rights and risks associated with this, such as: technical, political, economic, financial, among others risks that affect the execution and completion of the work, which are not fully incorporated in the discount rate And can even generate rights that provide flexibility to the project, which are valued and that with the application of traditional methodologies, are not incorporated or valued -- In this paper, two infrastructure projects will be evaluated, such as: -- Oleoducto Bicentenario de Colombia – Fase I Araguaney-Banadia (OBC) -- Proyecto Mejorías de la seguridad Energético del país y Desarrollo del Gasoducto Sur Peruano (GSP) -- On which the Real Options Valuation methodology will be applied, based on the estimate of the WACC average Cost of capital for infrastructure projects, incorporating the risks of each project and country through the Extended CAPM model -- Subsequently, some of the traditional valuation methods, such as Net Present Value or NPV, Internal Rate of Return or IRR, Profitability Index or IRR, Cost Benefit Ratio or RBC will be evaluated and will be complemented by the application of the Valuation by Real Options, using the Binomial Trees methodology for American type options and Black And Sholes Merton, for European type options -- In the development of this paper, the methodology will be presented to include the risks in the big infrastructure projects and the Real Options Assessment, incorporating the uncertainty of different strategic implementation alternatives contemplated in the same, specifically in the signed construction contracts

Vigilada Mineducación

Universidad con Acreditación Institucional hasta 2026 - Resolución MEN 2158 de 2018

Software DSpace copyright © 2002-2025 LYRASIS

  • Configuración de cookies
  • Enviar Sugerencias