Minimizing Makespan in a No-Wait Flow Shop With Batch Processing Machines

Fecha

2011-05-25

Autores

Muthuswamy
Shanthi
Mario C. Vélez-Gallego
Maya
Jairo
Rojas-Santiago
Miguel

Título de la revista

ISSN de la revista

Título del volumen

Editor

Institute of Industrial Engineers ( IIE )

Resumen

Given a set of jobs and two batch processing machines (BPMs) arranged in a flow shop environment
the objective is to batch the jobs and sequence the batches such that the makespan is minimized.

Descripción

Citación