Corto Circuito: una acción a la altura de la crisis
dc.contributor.advisor | Echavarría Goicoechea, María Victoria | |
dc.contributor.advisor | Uribe de Correa, Beatríz Amparo | |
dc.contributor.author | Herrera Muñoz, Fabián Hernán | |
dc.coverage.spatial | Medellín de: Lat: 06 15 00 N degrees minutes Lat: 6.2500 decimal degrees Long: 075 36 00 W degrees minutes Long: -75.6000 decimal degrees | eng |
dc.creator.degree | Magíster en Administración | spa |
dc.creator.email | fherrera@euroceramica.com | spa |
dc.date.accessioned | 2015-03-09T22:14:28Z | |
dc.date.available | 2015-03-09T22:14:28Z | |
dc.date.issued | 2014 | |
dc.description | Eurocerámica S.A. achieved positive, quick and systematic results in its productive process through the stabilization and normalization of some of its working conditions and the simultaneous use of analysis tools included in the TPM methodology (Total Productive Maintenance) -- A brief background, the company history, the applied methodology and the steps during the process are the way to understand how it was carried out and why it was called Corto Circuito | spa |
dc.description.abstract | Eurocerámica S.A. logró impactar de manera positiva, rápida y sistemática los resultados de su proceso productivo, mediante la estabilización y normalización de algunas de sus condiciones de trabajo y el uso simultáneo de herramientas de análisis, incluidas en la metodología TPM (Mantenimiento Productivo Total-Total Productive Maintenance) -- Una breve contextualización del entorno, de la historia de la empresa, de la metodología aplicada y la descripción de las etapas seguidas, son la vía para entender cómo se desarrolló el proceso y por qué, de manera espontánea, se le dio el nombre de Corto Circuito | spa |
dc.identifier.uri | http://hdl.handle.net/10784/5083 | |
dc.language.iso | spa | spa |
dc.publisher | Universidad EAFIT | spa |
dc.publisher.department | Escuela de Administración. Departamento de Organización y Gerencia | spa |
dc.publisher.program | Maestría en Administración - MBA | spa |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | eng |
dc.rights.local | Acceso abierto | spa |
dc.subject | Mantenimiento Productivo Total (TPM) | spa |
dc.subject | SIGMA (Control de calidad) | spa |
dc.subject.keyword | Ceramic industries | spa |
dc.subject.keyword | Maintenance | spa |
dc.subject.keyword | Machinery - Maintenance and repair | spa |
dc.subject.keyword | Industrial Productivity | spa |
dc.subject.keyword | Production management | spa |
dc.subject.keyword | Manufacturing processes | spa |
dc.subject.keyword | Labor productivity - Case studies | spa |
dc.subject.lemb | CONTROL DE PROCESOS INDUSTRIALES | spa |
dc.subject.lemb | INDUSTRIA CERÁMICA | spa |
dc.subject.lemb | MANTENIMIENTO | spa |
dc.subject.lemb | MAQUINARIA - MANTENIMIENTO Y REPARACIÓN | spa |
dc.subject.lemb | PRODUCTIVIDAD INDUSTRIAL | spa |
dc.subject.lemb | ADMINISTRACIÓN DE LA PRODUCCIÓN | spa |
dc.subject.lemb | PROCESOS DE MANUFACTURA | spa |
dc.subject.lemb | PRODUCTIVIDAD DEL TRABAJO - ESTUDIO DE CASOS | spa |
dc.title | Corto Circuito: una acción a la altura de la crisis | spa |
dc.type | info:eu-repo/semantics/masterThesis | |
dc.type | masterThesis | eng |
dc.type.hasVersion | acceptedVersion | eng |
dc.type.local | Tesis de Maestría | spa |
Archivos
Bloque original
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- FabiánHernánHerreraMuñoz_2014.pdf
- Tamaño:
- 419.3 KB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Texto Completo
Bloque de licencias
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- license.txt
- Tamaño:
- 2.5 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: