Production-inventory model with waiting time proportional to production time
dc.citation.epage | 64 | |
dc.citation.issue | 3 | |
dc.citation.journalAbbreviatedTitle | ing.cienc. | eng |
dc.citation.journalTitle | Ingeniería y Ciencia | eng |
dc.citation.spage | 51 | |
dc.citation.volume | 2 | |
dc.contributor.affiliation | Universidad de Antioquia | spa |
dc.contributor.author | Laniado Rodas, Henry | spa |
dc.contributor.author | García Suaza, Andrés F. | spa |
dc.coverage.spatial | Medellín de: Lat: 06 15 00 N degrees minutes Lat: 6.2500 decimal degrees Long: 075 36 00 W degrees minutes Long: -75.6000 decimal degrees | eng |
dc.date | 2006-06-01 | |
dc.date.accessioned | 2019-11-22T19:18:49Z | |
dc.date.available | 2019-11-22T19:18:49Z | |
dc.date.issued | 2006-06-01 | |
dc.description | In this paper we study a production model ¿inventory with constant demand and production rates. Within the assumptions it is considered that the waiting time, referred to the time in which the production unit is disabled, is proportional to the activity time of the same. The objective is to develop a mathematical model and determine the optimal number of cycles that minimize costs, or maximize utility. | eng |
dc.description | En este trabajo se estudia un modelo de producción ¿inventario con tasas de demanda y producción constantes. Dentro de los supuestos se considera que el tiempo de espera, referido al tiempo en que la unidad de producción está inhabilitada, es proporcional al tiempo de actividad de la misma. El objetivo es desarrollar un modelo matemático y determinar el número óptimo de ciclos que minimice los costos, o bien, maximice la utilidad. | spa |
dc.format | application/pdf | |
dc.identifier.issn | 2256-4314 | |
dc.identifier.issn | 1794-9165 | |
dc.identifier.uri | http://hdl.handle.net/10784/14562 | |
dc.language.iso | spa | spa |
dc.publisher | Universidad EAFIT | spa |
dc.relation.isversionof | http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/484 | |
dc.relation.uri | http://publicaciones.eafit.edu.co/index.php/ingciencia/article/view/484 | |
dc.rights | Copyright (c) 2006 Henry Laniado, Andrés F. García Suaza | eng |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | eng |
dc.rights.local | Acceso abierto | spa |
dc.source | instname:Universidad EAFIT | |
dc.source | reponame:Repositorio Institucional Universidad EAFIT | |
dc.source | Ingeniería y Ciencia; Vol 2, No 3 (2006) | spa |
dc.subject.keyword | Inventory | eng |
dc.subject.keyword | Production | eng |
dc.subject.keyword | Demand | eng |
dc.subject.keyword | Cycles | eng |
dc.subject.keyword | Inventario | spa |
dc.subject.keyword | Producción | spa |
dc.subject.keyword | Demanda | spa |
dc.subject.keyword | Ciclos | spa |
dc.title | Production-inventory model with waiting time proportional to production time | eng |
dc.title | Modelo de producción–inventario con tiempo de espera proporcional al tiempo de producción | spa |
dc.type | article | eng |
dc.type | info:eu-repo/semantics/article | eng |
dc.type | publishedVersion | eng |
dc.type | info:eu-repo/semantics/publishedVersion | eng |
dc.type.local | Artículo | spa |
Archivos
Bloque original
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- document (2).pdf
- Tamaño:
- 141.57 KB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Texto completo PDF