Examinando por Materia "Production control"
Mostrando 1 - 20 de 20
Resultados por página
Opciones de ordenación
Ítem Adaptación de la metodología TPM en empresas pequeñas y medianas (Pymes) del subsector panificador(Universidad EAFIT, 2016) Trujillo Hernández, Luis Eduardo; Villegas López, Gustavo AdolfoÍtem Advantages of learning factories for production planning based on shop floor simulation: A step towards smart factories in industry 4.0(Institute of Electrical and Electronics Engineers Inc., 2019-01-01) Andres M.; Alvaro G.; Julian M.; Andres M.; Alvaro G.; Julian M.; Universidad EAFIT. Departamento de Ingeniería de Producción; Tecnologías para la ProducciónIn future industry, defined as Industry 4.0, production planning and control strategies will be executed by human beings backed by computational tools for decision making; One of these tools is shop floor simulation, and a natural scenario to learn about how to use it for productive processes design and control are the Learning Factories. In this paper, shop floor simulation is identified as a tool for planning and controlling production, also a state of the art about its implementation is exposed in academic and industrial environments. In addition, the trends in the construction of the Learning Factories are shown, and some aspects about how they can be used for shop floor simulation. This work also proposes the realization of a digital model in EAFIT University Learning Factory as a first step towards digital learning factory. © 2019 IEEE.Ítem Aproximación en el uso del Mantenimiento Productivo Total-TPM en empresas que ya lo practican(Universidad EAFIT, 2014) Villegas López, Juan Santiago; Mora Gutiérrez, Luis AlbertoÍtem Aspects to consider for high quality administration of Corporate Distribution Centers (Centros de Distribución, CEDIS)(Journal of Economics, Finance and Administrative Science, 2011-06) Arrieta Posada, Juan Gregorio; Universidad EAFIT. Departamento de Ingeniería de Producción; jarrieta@eafit.edu.co; Gestión de Producción y LogísticaIn this document we present different aspects that are necessary to perform an excellent administration and control of distribution centers that corporations may have -- If these ideas are implemented correctly in an efficient way, most of the productivity problems in the warehouse could be solved easily -- Thus, it is important to evaluate the products’ activity profile, thelayout of the warehouse and the products’ flow through the distribution center -- The objective of this process is to obtain the conditions of a world class warehouseÍtem Aumento en el cumplimiento de los tiempos de entrega en una Mipyme metalmecánica(Universidad EAFIT, 2011) Kapkin Sierra, Pedro Samuel; Mejía Nieto, JavierEsta investigación pretendió aportar una mejora en el cumplimiento de los tiempos de entrega de una microempresa metalmecánica de la ciudad de Medellín por medio del seguimiento de una metodología de gestión y organización de procesos -- Inicialmente se estableció las causas de la situación actual de incumplimiento y sus posibles soluciones con el dueño de la empresa y sus trabajadores, posteriormente se realizó un estudio de algunas de las causas que daban lugar a dicha dificultad a través del seguimiento de la producción durante una semana -- Después se redactó la información preliminar de la empresa concerniente a la gestión interna de esta, como es la visión, la misión, los objetivos estratégicos, los puntos de control y los indicadores -- Luego de establecida esta información se procedió a investigar la manera de trabajar de dos empresas metalmecánicas del medio con el fin de establecer bases para el rediseño del proceso -- Una vez levantada esta información se procede a establecer el este rediseño por medio del levantamiento del flujo grama de este -- Teniendo este flujo grama se procede a la identificación de las actividades consideradas clave para el mejoramiento de las causas que daban lugar al incumplimiento para su posterior intervención -- Una vez rediseñado el proceso y las herramientas para la intervención de las actividades clave se ejecutó una prueba piloto y se observó una mejoría en el aprovechamiento del tiempo y gracias a esto en el cumplimiento en la entrega de aquellos trabajos programados para ser entregados durante el periodo de la prueba -- Con esto se concluyó que una mejor planeación y programación de las actividades de producción da lugar a mejoras en muchos aspectos relacionados con la calidad, el cumplimiento y la satisfacción del clienteÍtem Coordinación de una cadena de suministros en un modelo con dos cupos de reserva(Universidad EAFIT, 2010) Rendón Aguirre, Carolina; Arango Ospina, GerardoÍtem Creación e implementación de un sistema de semáforos para el control y coordinación de producción en la empresa Offiline S.A.S.(Universidad EAFIT, 2014) Arbeláez Arango, Santiago; Correa Ramírez, Juan Sebastián; Hernández Cobaleda, Luis EduardoÍtem Diseño de un prototipo de modelo de gestión de mantenimiento basado en protocolos de calificación de las máquinas de alimentos Friko S.A. para el traslado y operación de la Planta de Producción de carnes frías(Universidad EAFIT, 2010) Martínez Pérez, Pamela; Villegas López, Juan SantiagoÍtem Diseño e implementación de un modelo de inventarios para los productos descentralizados en la compañía AVON Colombia Ltda.(Universidad EAFIT, 2013) Jaramillo Maya, Daniel; Rangel Zuluaga, FranciscoEl proyecto busca implementar un modelo de inventarios para los productos descentralizados en la compañía Avon Colombia Ltda. a través del análisis de las variables más significativas en el proceso como los son la demanda, costos y tiempos de entrega, lo que permitirá tener una metodología para la gestión y control de los inventarios, que como consecuencia mejore los niveles de ocupación en bodega y disminuya los costos asociados al procesoÍtem Diseño, fabricación y análisis económico de una máquina moleteadora de manubrios para motocicleta(Universidad EAFIT, 2006) Posada Alzate, John Alejandro; Murcia García, Juan Antonio; Rodríguez García, AlbertoÍtem Estudio de casos de implantación exitosa de TPM en industrias ubicadas en el Eje Cafetero y Norte del Cauca – Colombia(Universidad EAFIT, 2015) Cardona Montoya, Diana Lorena; Villegas López, Gustavo AdolfoÍtem Estudio de prefactibilidad en la construcción de un centro de ciencia, tecnología e innovación abierta en ganadería de leche para Colombia(Universidad EAFIT, 2022) Tobón Roldán, José Fernando; Henao Arango, María CeciliaColombia has subregions that, due to their environmental and climatic conditions, are known for their extensive history as dairy production areas and a large part of its economy is based on it. However, it has not been oblivious to the problems that arise due to world events that have repercussions on the increase in inputs, in addition to the natural constant of supply and demand in the increases in the prices of fertilizers, concentrates, inputs, equipment, labor, import of whey and the lack of cutting-edge technology and easy access to it, which, undoubtedly, are detrimental to the economy of primary producers. The joint search for the strengthening of the sector is a transformative challenge, which universities, companies, and the state must work together to improve the quality of life and economic development of dairy farmers. To have the opportunity to build a center for science, technology, and open innovation in dairy farming for Colombia, a pre-feasibility stage must be initiated, which seeks to establish the need and construction of this. The development of this pre-feasibility research seeks to identify the context and economic situation on which dairy farming is in Colombia, carry out an analysis of the sector and demand, identify international developments to strengthen dairy farming and propose a structure and Pre-feasibility analysis for the construction of a center for dairy farming in Colombia. At the end of the research project, recommendations will be provided regarding the methodology and purpose of the construction of this center for dairy farming and this tripartite will be provoked: University, Company, and State, so that they jointly work to be the promoters of this project that seeks to contribute to the development of the dairy cattle sector in Colombia. Keywords: Pre-feasibility, CTI, Science, Technology, Innovation, Dairy farming, Production, Economic development, Dairy industry, dairy cattle - Colombia, Production control, dairy plants, dairy industry, agricultural companies.Ítem Herramientas de producción: ayudas para el mejoramiento de los procesos productivos(Fondo Editorial Universidad EAFIT, 2011) Arrieta Posada, Juan Gregorio; jarrieta@eafit.edu.coÍtem Implementación de plan piloto de TPM en una industria de cerámica(Universidad EAFIT, 2008) Pinto López, Diego Luís; Mesa Velásquez, Juan Fernando; Agudelo Suárez, Juan PabloÍtem Metodología para la implementación de manufactura sincrónica en Incolmotos-Yamaha S.A.(Universidad EAFIT, 2015) Fajardo Villa, Andrés Felipe; Uribe de Correa, Beatríz Amparo; Escalante Gómez, Juan EstebanLas diferentes necesidades, problemas y objetivos a los cuales se ven enfrentadas las compañías en el mundo, despiertan un interés en el desarrollo y ejecución implementación de sistemas de mejoramiento para alcanzar las metas que se proponen -- Cada compañía es particular y el tipo de herramienta a realizar depende principalmente de su estructura y de qué se quiere lograr con su implementación -- La empresa que es pionera y referente en este tipo de herramientas es Toyota, que a través de su TPS (Sistema de Producción Toyota) ha logrado crear todo un fenómeno alrededor del mejoramiento continuo -- El sistema productivo de Incolmotos – Yamaha ha entrado en una recesión productiva de la cual necesita salir rápidamente para seguir competitiva y rentablemente atractiva para sus inversionistas -- Para poder lograr este cambio es necesario definir la metodología para la implementación de producción sincrónica -- Esta metodología, que será definida con la ayuda de casos reales, información técnica de bases de datos especializadas y los lineamientos de la compañía, será también un referente para que otras compañías del grupo puedan realizar su propia implementación -- En esta propuesta se podrá encontrar la situación en estudio con varios contextos importantes como Sistema de producción Toyota, Manufactura Esbelta, Mapa de valor y Teoría de restricciones -- Además de la situación en estudio y las referencias que soportan el contextoÍtem Modelación de una situación empresarial para la enseñanza de simulación discreta(Asociación Colombiana de Facultades de Ingeniería (ACOFI), 2013-09-24) Carmona González, Guillermo L.; Montoya Agudelo, Juan Sebastián; Cano Escobar, María Adelaida; Álvarez Zapata, Daniela; Rodríguez Betancur, María Antonia; Universidad EAFIT. Departamento de Ingeniería de Producción; mrodri23@eafit.edu.co; dalvar35@eafit.edu.co; mcanoes@eafit.edu.co; jmonto41@eafit.edu.co; gcarmona@eafit.edu.co; Gestión de Producción y LogísticaDiscrete simulation is one of the tools that are used for modeling real systems and for evaluating the impact of certain decisions using the resulting model, improving with this the decisions making on the real system -- Discrete simulation has been taught in the simulation course of the Operations Management and Logistics program at EAFIT University -- However this course only has academic exercises for the modeling processes -- This motivated to the realization of a project for documenting a business scenario on which students can build a simulation supported on a real situation -- This would allow students an approach to the modeling of real industry problems -- The productivity analysis of a production line of the Bakery Company Novapan in Medellin city was elected as the business scenario -- The simulation was made through the discreet simulation software Promodel ® -- This Paper presents the main aspects of the analyzed business scenario, the methodology, the discrete simulation model, some simulation results, the educational proposal and some learned lessons during the development of this researchÍtem Planeación de la Producción(Fondo Editorial Universidad EAFIT, 2008-09) Castro Zuluaga, Carlos Alberto; Universidad EAFIT. Departamento de Ingeniería de Producción; ccastro@eafit.edu.co; Gestión de Producción y LogísticaEste texto presenta desde un punto de vista sistémico, el proceso de la planeación de la producción con el propósito de que el lector comprenda, analice, desarrolle, relacione e implemente las diferentes etapas que lo conforman -- Teniendo en cuenta sus experiencias docentes y empresariales, el autor brinda un enfoque aplicativo de cada uno de los temas tratados, mediante la utilización de una adecuada formulación matemática, ejemplos ilustrativos resueltos detalladamente, problemas propuestos y casos que integran las diferentes fases de la planeación de la producción, convirtiéndolo en un recurso valioso para estudiantes, profesionales y profesores -- El libro incluye los temas de planificación y control de la producción, pronósticos de la demanda, planificación y control de la capacidad, planeación agregada y planeación de los requerimientos de materialesÍtem Propuesta de plan piloto para mantenimiento autónomo en una industria de alimentos(Universidad EAFIT, 2007) Alzate Álvarez, Lina Marcela; Villegas López, Gustavo AdolfoÍtem Reducción de desperdicios en línea de lámina y vena de tabaco en el proceso de elaboración de picadura en Coltabaco S.A.(Universidad EAFIT, 2011) Hernández Mejía, Andrés Felipe; Cano, Pablo AndrésÍtem A variable neighborhood search algorithm to minimize the total weighted tardiness on a batch processing machine(Revista Ingeniería Industrial, 2011-08-11) López Jiménez, Juan Diego; Vélez Gallego, Mario César; López Jiménez, Juan Diego; Vélez Gallego, Mario César; Universidad EAFIT. Grupo de Investigación Gestión de Producción y Logística; Universidad EAFIT. Departamento de Ingeniería de Producción; marvelez@eafit.edu.co; Gestión de Producción y LogísticaThis paper presents the results of a research project conducted to solve a production scheduling problem observed in a system in which meeting customer due dates is the primary objective -- Each job to be scheduled is defined by its processing time, ready time, due date, weight and size -- The Batch Processing Machine (BPM) can process several jobs simultaneously as a batch as long as its capacity is not violated -- The processing time of a batch is the largest processing time among the jobs in the batch, and the batch ready time is the largest ready time among the jobs in the batch -- Given that the problem is NP-hard we propose a Variable Neighborhood Search (VNS) heuristic to minimize the total weighted tardiness on a single BPM -- The computational experiments conducted to assess the quality of the solutions found show that in a computational time restricted to a maximum of 30 minutes, the proposed heuristic finds solutions considerably better than the solutions obtained after implementing a mixed integer programming model available in the literature in a commercial solver