Logotipo del repositorio
  • English
  • Español
  • Français
  • Português
  • Iniciar sesión
    ¿Has olvidado tu contraseña?
Logotipo del repositorio
  • Comunidades
  • Listar por
  • English
  • Español
  • Français
  • Português
  • Iniciar sesión
    ¿Has olvidado tu contraseña?
  1. Inicio
  2. Examinar por materia

Examinando por Materia "PRODUCTIVIDAD DEL TRABAJO - ESTUDIO DE CASOS"

Mostrando 1 - 2 de 2
Resultados por página
Opciones de ordenación
  • No hay miniatura disponible
    Ítem
    Corto Circuito: una acción a la altura de la crisis
    (Universidad EAFIT, 2014) Herrera Muñoz, Fabián Hernán; Echavarría Goicoechea, María Victoria; Uribe de Correa, Beatríz Amparo
    Eurocerámica S.A. logró impactar de manera positiva, rápida y sistemática los resultados de su proceso productivo, mediante la estabilización y normalización de algunas de sus condiciones de trabajo y el uso simultáneo de herramientas de análisis, incluidas en la metodología TPM (Mantenimiento Productivo Total-Total Productive Maintenance) -- Una breve contextualización del entorno, de la historia de la empresa, de la metodología aplicada y la descripción de las etapas seguidas, son la vía para entender cómo se desarrolló el proceso y por qué, de manera espontánea, se le dio el nombre de Corto Circuito
  • No hay miniatura disponible
    Ítem
    Identificación de variables incidentes en el presupuesto de las labores de mantenimiento correctivo en la infraestructura de distribución acueducto en el Área Metropolitana del Valle de Aburrá
    (Universidad EAFIT, 2017) García Henao, Willy; Botero Botero, Luis Fernando
    This paper contains the procedures and results of the business case study, which aims to identify and assess the variables that influence the increase of value of the economic offers submitted by the contracting firms to meet the corrective maintenance needs of the water supply system of the Metropolitan Area of the Valley of Aburrá located in Medellín, Colombia, with the purpose of being taken into account and incorporated into the elaboration of the reference budgets of the Colombian utility company Empresas Públicas de Medellín -- As a result of the literature review, it was identified that the most influential variables in the costs of the evaluated activities were the human labor and the transport of staff, so it was decided to assess them quantitatively as a productivity and labor yields analysis for the first variable and average travel times and speeds for the second -- As a result of compiling and analyzing the data statistically, the general coefficient of productivity was obtained for the evaluated contract and a database of labor yields was made for the most representative activities of the analyzed contract, and a map of approximate isochronous lines for the area of influence of the project was made -- By last, the differences in direct costs presented by contractors were identified as compared to those calculated by EPM related to labor and transportation of staff, materials and equipment

Vigilada Mineducación

Universidad con Acreditación Institucional hasta 2026 - Resolución MEN 2158 de 2018

Software DSpace copyright © 2002-2025 LYRASIS

  • Configuración de cookies
  • Enviar Sugerencias