Logotipo del repositorio
  • English
  • Español
  • Français
  • Português
  • Iniciar sesión
    ¿Has olvidado tu contraseña?
Logotipo del repositorio
  • Comunidades
  • Listar por
  • English
  • Español
  • Français
  • Português
  • Iniciar sesión
    ¿Has olvidado tu contraseña?
  1. Inicio
  2. Examinar por materia

Examinando por Materia "ARIMAX – ARCH"

Mostrando 1 - 3 de 3
Resultados por página
Opciones de ordenación
  • No hay miniatura disponible
    Ítem
    Análisis económico del mecanismo de respuesta de la demanda en el sector eléctrico colombiano
    (Universidad EAFIT, 2017-07-01) García, John J.; Gutierrez, Alejandro; Vargas Tobón, Luisa; Velasquez, Hermilson; jgarcia@eafit.edu.co; lvargas9@eafit.edu.co; evelas@eafit.edu.co
    This paper is based upon the PJM market Demand Response Program, which it is considered as one of the most successful DR mechanisms over the world. Based on its design, the economic impact that could be achieve if a similar DR program were implemented in the Colombian market was determined. A DR program has been proposed that could achieve 600 MW of capacity in a mature stage. When its impact was took into account in the market price, it was found that for 2015 its impact in the DR dispatch hours could achieve lowering spot price in around 30%. With these results it can be estimated that the system could save about COP130.000 million, regardless of its contribution to the system reliability that, in the past El Niño event (2015-2016), could have reduced blackout risks.
  • No hay miniatura disponible
    Ítem
    Análisis económico del mecanismo de respuesta de la demanda en el sector eléctrico colombiano (Julio de 2017)
    (Universidad EAFIT, 2017-10-09) García, John J.; Gutierrez, Alejandro; Vargas Tobón, Luisa; Velasquez, Hermilson; jgarcia@eafit.edu.co; lvargas9@eafit.edu.co; evelas@eafit.edu.co
    This paper is based upon the PJM market Demand Response Program, which it is considered as one of the most successful DR mechanisms over the world. Based on its design, the economic impact that could be achieve if a similar DR program were implemented in the Colombian market was determined. A DR program has been proposed that could achieve 600 MW of capacity in a mature stage. When its impact was took into account in the market price, it was found that for 2015 its impact in the DR dispatch hours could achieve lowering spot price in around 30%. With these results it can be estimated that the system could save about COP130.000 million, regardless of its contribution to the system reliability that, in the past El Niño event (2015-2016), could have reduced blackout risks.
  • No hay miniatura disponible
    Ítem
    Redes inteligentes y mecanismo de respuesta de la demanda: el caso del sector eléctrico colombiano Smart grids and demand response mechanism: the case of the Colombian electricity market ?
    (Universidad EAFIT, 2018-11) Garcia, John; Gutiérrez, Alejandro; Velasquez, Hermilson; Vargas, Luisa; jgarcia@eafit.edu.co
    Smart grids now figure prominently in the international debate on the design and regulation of electricity markets. This paper analyzes the potential effects of implementing a demand response mechanism in the Colombian wholesale electricity market with characteristics similar to that of the PJM market. Using time series models and controlling for the high volatility presented in the spot price, we estimate that such a mechanism could yield significant economic savings for customers. For example, if the demand response mechanism had been implemented during 2015, the spot price in peak hours would have been 30% lower and customers would have saved approximately COP $99.000 million.

Vigilada Mineducación

Universidad con Acreditación Institucional hasta 2026 - Resolución MEN 2158 de 2018

Software DSpace copyright © 2002-2025 LYRASIS

  • Configuración de cookies
  • Enviar Sugerencias